EL FATEH PROJECTS LLC. ENGINEERING THE PRESENT, POWERING THE FUTURE
EL FATEH PROJECTS LLC. ENGINEERING THE PRESENT, POWERING THE FUTURE
Client : The General Authority for Red Sea Ports
This project involved the supply and installation of advancednavigational aids at Ain Sokhna Port. The state-of-the-art Sealite marine lanterns with GSMremote monitoring systems were installed to enhance maritime safety and comply withIALA standards
Client : The General Authority for Red Sea Ports
El Fateh Projects supplied and installed fixed beacons at Safaga Port.These beacons were specifically manufactured at our facility with cutting-edge designs towithstand harsh environmental conditions and significant wind stresses. This installationplayed a crucial role in enhancing the port’s navigational safety.
Client : General Authority for Alexandria Port
The project focused on replacing navigational aids at key locations inDekheila Port. El Fateh Projects installed OMS port entry lanterns from the Phecda productrange, featuring GPS synchronization. The lanterns were powered by DC systems to ensureuninterrupted operations, providing reliable and continuous safety measures for port entry.
Client : Egyptian Authority for Maritime Safety (EAMS)
EAMS managed the largest AtoNs project in the Gulf of Suez, renovating all onshore sites. El Fateh Projects installed Tideland and Sabik Marine rotating beacons, along with Sealite flashing lanterns. An advanced Star2M monitoring system, using Sealite’s GSM units, ensured efficient control of the navigational aids. Let me know if you’d like to move on to the Maintenance Projects or make further adjustments
Client : The General Authority for Red Sea Ports
This project involved the maintenance and enhancement of three beacons at Port Tawfiq and Al-Zeitiyat Ports. The work included repairing concretefoundations, reinforcing metallic structures, repainting surfaces, and replacing damagedcomponents. The maintenance ensures these vital navigational aids continue to operateeffectively, providing safe passage for vessels entering and exiting the ports
Client : The General Authority for Red Sea Ports
This project focused on the maintenance and enhancement of three beacons at Safaga Port. Key tasks included repairing and strengthening the concrete foundations, sanding and repainting the beacons, and installing new stainless-steel fasteners to secure the structure. The project ensures ongoing safety and reliability for the port’s maritime navigation systems.
Client : The General Authority for Red Sea Ports
This project involved the placement and installation of two mooring buoys at Nuweiba Port. One of the buoys required a complete refurbishment, which included installing a new steel structure and body. Additional tasks involved lifting the buoys from the storage yard, installing new chains, and securely anchoring the buoys in the water. All work was executed with strict adherence to safety protocols, ensuring the buoys meet the highest standards for maritime operations
Send us a message to request a quote
El Fateh Projects © Copyrights 2024 | Designed & Developed by The GABS